Request a Quote

MEP & Building Services · KuwaitERP for HVAC Contractors

Run tenders, BOQ, procurement, site and billing for HVAC Contractors in one Odoo ERP - set up for KWD accounts, PAM payroll and Arabic/English billing.

The Challenges

What HVAC Contractors struggle with

Day-to-day problems that cost time and margin - and how one ERP solves them.

MEW load approvals & connections

Follow electrical load approvals, substation requirements, water connections and inspections with the Ministry of Electricity, Water and Renewable Energy (MEW) so each building is energised and handed over on time.

Kuwait Fire Force approvals

Track fire-system drawing approvals, site inspections and final sign-off from the Kuwait Fire Force for sprinklers, fire alarm, fire pumps and smoke control on every project.

Submittals & approved equipment

Keep material submittals, technical data, test certificates and consultant approvals for cables, ducts, pipes and chillers in one place so nothing unapproved is bought or installed.

Cooling loads & energy efficiency

Record cooling loads, equipment efficiencies and insulation details that MEW energy-conservation requirements and the consultant ask for, in a climate where air-conditioning drives demand.

Package cost & site stores

Issue materials from site stores against each MEP package, track wastage and technician hours, and compare cost with the package BOQ before margins slip.

Testing, commissioning & closeout

Log T&C sheets, snag lists, O&M manuals and as-built drawings so the consultant, MEW and the Fire Force can accept the systems without repeat visits.

Capabilities

One ERP for the whole project lifecycle

HVAC BOQ Management

Multi-level HVAC BOQs with revisions and estimated-vs-actual cost.

Estimation & Tendering

Estimate labour, equipment and material for accurate HVAC tenders.

Material Requisition

Site requests for ducts, refrigerant and accessories with approvals.

Procurement

RFQs, vendor comparison and POs for chillers, AHUs and materials.

Inventory & Warehouse

Track HVAC materials across sites with transfers and valuation.

Project Cost Control

Live budget vs actual vs committed cost per project.

Subcontractor Management

Ducting, insulation and electrical subcontracts, certificates and retention.

Progress Billing & Retention

Progress / IPC bills, retention and customer invoices.

Variation Orders

Capture scope changes with approvals, cost impact and billing.

Equipment & Asset Management

Track machinery, maintenance and utilization.

Document Management

Drawings, submittals, approvals and O&M manuals, version-controlled.

Reports & Dashboards

Project profitability, BOQ, procurement and cost insights.

How It Works

Project workflow

01

Lead & Tender

Build accurate HVAC BOQs and tenders with labour, equipment and material rates.

02

Estimation & BOQ

Convert the won tender into a live BOQ and project budget.

03

Procurement

Raise RFQs and POs for chillers, AHUs, ducting and accessories against the schedule.

04

Site Execution

Issue material to site via requisitions and track installation progress.

05

Cost Control

Monitor budget vs actual vs committed cost across material, labour and equipment.

06

Progress Billing

Generate IPC / progress bills and retention as work completes.

07

Handover

Close the project with final accounts and documentation.

Benefits & Results

Why it pays off

01

Real-time cost and profitability on every project

02

BOQ, procurement and job costing in one connected system

03

Faster progress (IPC) billing and retention to protect cash flow

04

KWD accounts, PAM-aligned payroll and Arabic/English support from an Official Odoo Silver Partner

AGM Global Services is an Official Odoo Silver Partner with 100+ ERP implementations across 9+ countries over 9+ years, and construction is our flagship specialism - delivered to contractors in Kuwait remotely, with on-site visits at key milestones.

Overview

One platform, end to end

Streamline tender, BOQ, procurement, site execution and billing for HVAC Contractors with one connected platform - built around how projects run in Kuwait: Kuwait Municipality permits and consultant quality records, Kuwait Fire Force approvals, payroll following PAM rules with PIFSS and end-of-service indemnity, audit-ready KWD accounts, and subcontractor and retention control on FIDIC-based contracts.

AGM Construction ERP, powered by Odoo, is configured for HVAC contractors across Kuwait and the GCC. It connects HVAC BOQ and estimation to equipment procurement, material requisition, project cost control, subcontractor management, progress billing, retention, variation orders and document management - in one platform with real-time profitability on every project.

Because it is built on Odoo, the system is modular and covers the full MEP picture - HVAC, electrical and plumbing scopes, accounting and procurement all share one source of truth. You start with the modules you need and scale up, with no vendor lock-in and local implementation and support from an Official Odoo Silver Partner.

Experience ERP in just two clicks

FAQ

Frequently asked questions

Can the ERP handle HVAC BOQ and estimation?

Yes - multi-level HVAC BOQs covering ducting, equipment and accessories, with revision history and estimated-vs-actual tracking.

Does it track MEW load approvals and connections?

Yes - load approvals, connection requests and inspections with MEW are followed per building, so power and water are connected when the programme needs them.

Can it manage Kuwait Fire Force approvals?

Yes - fire-system drawing approvals, inspection results and final sign-off from the Kuwait Fire Force are tracked from first submission to handover.

Does it keep MEP submittals and test certificates?

Yes - submittals, data sheets, test certificates and consultant approvals are logged against each item, so only approved products are ordered and installed.

Can it hold energy-efficiency data for MEW requirements?

Yes - cooling loads, equipment efficiencies and insulation details are stored with the relevant MEP package for consultant and authority review.

Does it cover testing, commissioning and handover?

Yes - T&C sheets, snag lists, O&M manuals and as-built drawings are captured so closeout with the consultant and authorities stays on schedule.