Construction Estimation SoftwareWin more tenders with accurate estimates
Build accurate estimates from your own rate library, compare supplier quotes, set your margin, and turn the winning bid into the project budget - all in Odoo, set up by AGM for contractors in Kuwait.
Built for Kuwait
What a contractor in Kuwait City, Ahmadi, Jahra or Farwaniya needs for clean books and a well-run site workforce - configured from day one, not bolted on later.
Audit-ready accounts in KWD
Multi-company books kept to three decimals, project-level profit and loss, and statements your auditors and banks can rely on - with VAT ready to switch on if Kuwait introduces it.
PAM payroll & end-of-service
Site payroll with salaries paid by bank transfer under PAM rules, PIFSS contributions for Kuwaiti staff, overtime, allowances and end-of-service indemnity.
Arabic & English documents
Quotations, IPCs, invoices and contracts printed in Arabic, English or both, so clients, consultants and ministries each get the layout they expect.
Still pricing tenders in Excel?
Spreadsheets work for a bid or two. Then the tenders get bigger, the team grows, and the expensive mistakes start.
One broken formula, one wrong bid
Linked sheets, copied tabs and hidden cells. A single error can under-price the whole tender.
Estimate_v7_FINAL(2).xlsxLast year's rates in this year's tender
Every estimator keeps their own price list, so steel, concrete and labour rates drift out of date.
Days to price a single BOQ
Re-typing items and chasing quotes by email means rushed bids - or tenders you don't submit at all.
The estimate disappears after award
Site builds a new budget from scratch, so nobody can see whether the job is beating or losing to the bid.
Know exactly where every rate comes from
- Every rate built from resources in your library - not a number typed from memory
- Change the steel price once and every item that uses it re-prices
- Set overheads, risk and margin per section and see the bid total move live
Reinforced concrete C40 - raft foundation
Item 03.02.01 · KWD per m³| Resource | Qty | Rate | Amount |
|---|---|---|---|
| Ready-mix concrete C40 (+3% waste)1.03 m³ × 310.00 | 1.03 m³ | 310.00 | 319.30 |
| Rebar, Grade 60120 kg × 3.10 | 120 kg | 3.10 | 372.00 |
| Formwork & sundries1 item × 45.00 | 1 item | 45.00 | 45.00 |
| Labour - steel fixing & pouring2.5 hr × 34.00 | 2.5 hr | 34.00 | 85.00 |
| Plant - concrete pump & vibrator0.4 hr × 70.00 | 0.4 hr | 70.00 | 28.00 |
- Direct cost
- 849.30
- Overheads 8%
- 67.94
- Profit 10%
- 91.72
- Unit rate per m³
- 1,008.96
From tender BOQ to a winning bid
- 1Step 01
Import the BOQ
Bring in the tender BOQ from Excel with sections and item codes intact.
- 2Step 02
Build the rates
Price each item from material, labour, plant and subcontract rates in your library.
- 3Step 03
Add quotes & margin
Compare supplier and subcontractor quotes, then add overheads, risk and profit.
- 4Step 04
Review & submit
Approve the bid, keep every version, and export the priced BOQ for the client.
- 5Step 05
Win & start the job
The awarded estimate becomes the project budget - actual cost tracked against it.
Everything your estimators need
In one system that's connected to purchasing, projects and accounting.
Cost database & rate library
Materials, labour crews, equipment and standard item build-ups in one place.
Resource-based rate build-up
Each unit rate built from quantities and prices you can audit line by line.
Supplier & subcontractor quotes
Request, compare and pick quotes, then drop the chosen price into the estimate.
Overheads, risk & margin
Apply mark-ups per section or across the tender and see the bid price update.
Tender versions & approvals
Revise, compare versions and get sign-off before anything goes to the client.
Priced BOQ export
Send the priced BOQ back in Excel or PDF, in the client's own format.
Estimate vs actual
See where jobs beat or missed the estimate, and sharpen the next tender.
Estimate to budget & billing
The won estimate drives the project budget, purchasing and progress invoices.
Arabic, English & multi-currency
Work in either language and take quotes in USD or EUR alongside local currency.
Built for contractors in Kuwait
See your own BOQ priced in Odoo
Bring a BOQ from a recent tender and we'll show you how it's priced, approved and turned into a project budget - in one session.
Construction estimation questions, answered
It's software estimators use to price a tender: take the Bill of Quantities, build a rate for every item from material, labour, equipment and subcontract costs, add overheads and profit, and produce the bid price - from one shared cost database instead of separate spreadsheets.
Rates come from one maintained library, so nobody prices with last year's steel price or a broken formula. Every tender keeps its versions and approvals, and when you win, the estimate becomes the project budget - no re-typing, and you can finally compare estimated against actual cost.
Yes. Import the tender BOQ with its sections, item codes, descriptions and quantities intact, price it, and export the priced BOQ back to Excel or PDF in the format the client asked for.
Yes. Your material prices, labour crews, equipment rates and standard item build-ups live in one library. Purchase prices from real jobs can update it, so each new tender starts from what work actually cost you.
The awarded estimate converts into the project budget in Odoo. Purchases, material requests, labour and subcontract costs are then tracked against each estimated line, and progress invoices are raised from the same BOQ.
Yes. Odoo runs fully in Arabic and English, right-to-left included, and each user can work in their own language on the same estimate.
The winning estimate becomes the project budget, and progress invoices are issued from Odoo in KWD with Arabic and English layouts and audit-ready postings. AGM, an Official Odoo Silver Partner, configures your estimating workflow and trains your team.