MEP & Building ServicesERP for HVAC Contractors

Run tenders, BOQ, procurement, site and billing for HVAC Contractors in one Odoo ERP - delivered by an Official Odoo Silver Partner.

The Challenges

What HVAC Contractors struggle with

Day-to-day problems that cost time and margin - and how one ERP solves them.

Chiller and AHU lead times

Chillers, air handling units and VRF outdoor units are often built to order, so a late order can hold up cooling for an entire building.

Duct fabrication offcuts

Sheet metal is cut in the workshop from shop drawings, and design changes or poor nesting turn into scrap that nobody costs.

Refrigerant and copper control

Refrigerant cylinders, copper pipe and insulation are small, valuable and easy to lose between the store and the site.

Testing, adjusting and balancing

Air and water balancing happens at the very end, and missing readings or out-of-range diffusers delay the handover certificate.

Equipment selection changes

When the consultant changes a unit's capacity or brand, the price, delivery date and electrical load all move at once.

Defects liability call-outs

After handover, comfort complaints and unit faults keep coming in, and warranty visits eat into margin if they are not tracked.

Capabilities

Odoo apps for HVAC Contractors

Purchase

Tracks long-lead chillers, AHUs and VRF units from RFQ to delivery, with expected dates visible to the project team.

Manufacturing

Turns duct shop drawings into work orders so sheet metal, labour and scrap in the workshop are costed per job.

Inventory

Controls refrigerant cylinders, copper coils and insulation rolls by location, including site stores and vans.

Quality

Records duct leakage tests, pipe pressure tests and air balancing readings as quality checks with pass or fail.

Maintenance

Registers every installed unit with serial number and warranty dates for the defects period and any service contract.

Field Service

Sends technicians to warranty and comfort call-outs with a worksheet the client signs on site.

How It Works

Project workflow

01

Price the cooling load

Quote equipment, ductwork by area, piping and controls in Sales, with optional lines for alternative unit brands.

02

Lock in long-lead equipment

Turn the approved equipment schedule into Purchase orders early and track promised ship dates against the installation programme.

03

Fabricate and deliver duct

Use Manufacturing work orders to cut sheet metal from shop drawings, then move finished sections to site through Inventory.

04

Install, test and balance

Plan crews in Planning, record pressure tests and air balancing readings in Quality, and log snag fixes as tasks.

05

Hand over and maintain

Register each unit as Maintenance equipment with its serial number and warranty, and handle defects through Field Service or Helpdesk.

In Practice

Built around how HVAC Contractors work

Typical BOQ linesItem
  1. 1.01Supply and install 200 TR air-cooled scroll chiller complete with anti-vibration mounts, nr
  2. 1.02Supply and install double-skin air handling unit, 8,000 l/s, with VFD, nr
  3. 1.03Supply and install galvanised sheet metal ductwork, 0.8 mm gauge, including supports, m2
  4. 1.04Supply and install 25 mm closed-cell elastomeric duct insulation with aluminium foil facing, m2
  5. 1.05Supply and install 600x600 four-way ceiling diffuser with opposed blade damper, nr
  6. 1.06Supply and install 150 mm dia. black steel chilled water pipe, insulated, m
  7. 1.07Supply and install 2.8 kW VRF indoor cassette unit with wired controller, nr
  8. 1.08Testing, adjusting and balancing of air and water systems, lump sum
For example

Picture a mid-sized HVAC contractor fitting out an office block with two chillers, eight AHUs and several hundred diffusers. The chillers are ordered in Purchase as soon as the submittal is approved, and the expected delivery date sits beside the installation task. Duct sections are cut in the contractor's own workshop through Manufacturing work orders, so sheet metal waste is visible per floor. On site, pressure test and balancing results are entered as Quality checks. After handover, each unit is registered in Maintenance, so warranty call-outs go straight to a Field Service technician with the right history.

Benefits & Results

Why it pays off

01

Accurate HVAC BOQ and estimation with full revision history

02

Equipment procurement tracked against the project schedule

03

Real-time project cost - material, labour, equipment and subcontract

04

Automated progress (IPC) billing and retention for faster cash flow

05

Every variation captured and billed, not absorbed

06

One connected system across every HVAC project and site

AGM Global Services is an Official Odoo Silver Partner in Qatar with 100+ ERP implementations across 9+ countries over 9+ years, and construction is our flagship specialism.

Overview

One platform, end to end

Streamline tender, BOQ, procurement, site execution and billing for hvac contractors with one connected platform - implemented and supported by an Official Odoo Silver Partner in Qatar.

AGM Construction ERP, powered by Odoo, is configured for HVAC contractors across Qatar and the GCC. It connects HVAC BOQ and estimation to equipment procurement, material requisition, project cost control, subcontractor management, progress billing, retention, variation orders and document management - in one platform with real-time profitability on every project.

Because it is built on Odoo, the system is modular and covers the full MEP picture - HVAC, electrical and plumbing scopes, accounting and procurement all share one source of truth. You start with the modules you need and scale up, with no vendor lock-in and local implementation and support from an Official Odoo Silver Partner.

Experience ERP in just two clicks

FAQ

Frequently asked questions

Can Odoo cost our duct workshop separately from site installation?

Yes. Duct fabrication can run as Manufacturing work orders with their own material and labour cost, and finished sections are transferred to the project so workshop and site costs stay apart.

How do we follow up on chillers and AHUs with long delivery times?

Each purchase order line carries an expected arrival date, and the project team can filter late orders. Linking the order to the installation task makes any slippage visible early.

Can we record testing and balancing results?

Yes. Duct leakage, pipe pressure and air balancing readings can be captured as Quality checks attached to the project, so the handover file shows what was tested and when.

Can we manage annual maintenance contracts after handover?

Yes. Installed units are registered as equipment, preventive visits are scheduled in Maintenance, and recurring service contracts can be invoiced on a schedule through Sales and Accounting.